Works are continuing across Stage 1 North and Stage 1 Central, with several key activities planned along the corridor.
• Final asphalting and line marking at Helensvale Road, Monterey Keys Drive and McPhail Road
• Ongoing project works south of Helensvale Road
• Continued roadworks at the Shipper Drive service road
Temporary traffic changes may include lane closures, lane reconfigurations and some night works on:
• Helensvale Road
• Monterey Keys Drive
• Hope Island Road
• McPhail Road
• Foxwell Road
• Finnegan Way
• Shipper Drive
Planned works for January include:
• Continued bridge construction at Careel Reserve (North) and along the Gold Coast Highway (bridge widening and works north of the highway)
• Ongoing earthworks
• Investigation and relocation of service facilities within Rosedale Place Reserve and around Ridgevale Drive
• Continued works along Gold Coast Highway westbound, between Buckler Drive and Discovery Drive, including asphalting and service relocations
Temporary traffic changes may include lane or shoulder closures, stop/slow conditions and reduced speed limits on:
• Ridgevale Drive (between Mildura Drive and Cootharaba Drive)
• Mildura Drive (between Ridgevale Drive and Rosedale Place)
• Gold Coast Highway (between Buckler Drive and Discovery Drive)
• Gold Coast Highway (between Discovery Drive and Binstead Way)


